1/ Builders used to pay PST on construction materials.
2/ PST was part of the cost to build a house.
3/ The PST was included or embedded in the house selling price.
4/ The embedded PST on the average was about 2% of the house price.
2/ PST was part of the cost to build a house.
3/ The PST was included or embedded in the house selling price.
4/ The embedded PST on the average was about 2% of the house price.
No comments:
Post a Comment